Field Notes from the Transition: Tip #8
Many implementation failures occur not because of poor execution, but because project timelines collide with peak operational periods. Aligning project milestones with real operational capacity is essential to protect both performance and adoption.
Field Notes from the Transition #7
Many operations are surrounded by dashboards and KPIs, yet still struggle to translate metrics into consistent action. True operational maturity is not measured by how much data you have, but by how clearly that data drives decisions on the floor.
Field Notes from the Transition #6
Many system requirements are not true requirements at all. They are legacy workarounds that reflect past constraints rather than future needs. Filtering these out early is critical to preventing inefficiency from being embedded into new systems.
Field Notes from the Transition: Tip #3
Many operations assume they have outgrown their facility when the real constraint is unused vertical space. A proper vertical cube audit often reveals hidden capacity, improved flow, and avoids unnecessary expansion costs.
Field Notes from the Transition #1
Many organizations expect a new WMS to create operational discipline. In reality, systems inherit the conditions already present on the floor. Before kickoff, perform a physical logic audit to ensure your operation is ready for the software you are about to implement.